Certifications & Manufacturing — Verifiable Proof for Tender Evaluators.

Every ISO, IEC, TÜV and bankable-guarantee claim on this page is third-party-audited, certificate-numbered, and structured so procurement officers can lift references straight into bid submissions — without follow-up emails.

AUDITED METRICS · AS OF Q4 2024
  • 06ISO & IEC certifications held
  • 98.4%On-time commissioning rate (TÜV Rheinland audited)
  • 14Active patents in power-conversion topologies
  • $42MSingle-project bonded capacity
  • 12,400Certified panel-shop floor in Kocaeli
  • 11Countries with delivered projects
Cert references below are formatted for direct lift into a tender checklist (scope / issuing body / certificate number / expiry).
§ 01 / CERTIFICATE REGISTRY

Every certification, in the language a procurement officer copies into a bid.

Six standards. One vendor. Each line lists the scope statement, issuing body, and certificate number — so your tender evaluator can paste the reference into a compliance matrix without writing back to ask.

  1. 01 / 06
    ISO 9001:2015

    Quality Management System

    Issuing body
    TÜV Rheinland Türkiye
    Cert. no.
    01 100 2300/01
    Scope
    Design, manufacture, installation & commissioning of LV/MV switchgear, power conversion systems and turnkey electromechanical projects.
    Surveillance
    Annual (next audit Q2 2025)
  2. 02 / 06
    ISO 14001:2015

    Environmental Management System

    Issuing body
    TÜV Rheinland Türkiye
    Cert. no.
    01 104 2300/01
    Scope
    Manufacturing of LV/MV switchgear, power electronics and field-service operations across 11 countries.
    Surveillance
    Annual (next audit Q2 2025)
  3. 03 / 06
    ISO 45001:2018

    Occupational Health & Safety

    Issuing body
    TÜV Rheinland Türkiye
    Cert. no.
    01 113 2300/01
    Scope
    Project execution, panel-shop operations, and on-site commissioning. 0.18 TRIR rolling 2022–2024.
    Surveillance
    Annual (next audit Q2 2025)
  4. 04 / 06
    ISO/IEC 27001:2022

    Information Security Management

    Issuing body
    TÜV Rheinland Türkiye
    Cert. no.
    01 153 2300/01
    Scope
    Scada platform (ETE-Scada), remote-monitoring telemetry, and project-data handling for 412 industrial sites.
    Surveillance
    Annual (next audit Q3 2025)
  5. 05 / 06
    IEC 61439-1/2

    Low-Voltage Switchgear Assembly

    Issuing body
    DEKRA Certification GmbH
    Test report
    DEKRA-6042-A-2023
    Scope
    Type-tested LV assemblies up to 6,300 A / 100 kA — verified at in-house Kocaeli type-test bay.
    Designation
    ETE-LV-7 series
  6. 06 / 06
    IEC 61850-3 Ed.2

    Substation Automation & Communication

    Issuing body
    TÜV SÜD South Asia
    Cert. no.
    TÜV-SG-2023-1187
    Scope
    IEDs, gateways and station bus for 154 kV / 36 kV substations. First Turkish vendor on this qualification list — 6 in EMEA.
    Edition
    Edition 2 (2018) + Amd.1

Need scanned PDF copies with wet stamps? Issued within 24 hours on a signed NDA.

Request a Technical Proposal
Kocaeli panel-shop floor with LV switchgear and 36 kV MV cells in production.
FIG. 1 — KOCAELI PANEL SHOP, BAY 03 / LV LINE
§ 02 / MANUFACTURING FLOOR

One roof, one quality system. LV and 36 kV MV under a single IEC-tested ceiling.

The Kocaeli facility is 12,400 m² of enclosed shop floor on the Gebze OSB site — engineered so every cubicle leaves through the same type-test bay, audited under the same ISO 9001 envelope, and signed off by the same PE-licensed engineers who design the schematic.

  • Enclosed floor area 12,400 m² single ISO 9001 / IEC 61439 envelope
  • LV switchgear lines 04 up to 6,300 A / 100 kA
  • MV cell lines (36 kV) 02 vacuum / SF₆-free options
  • Type-test bay 01 DEKRA-witnessed short-time & peak withstand
  • Daily throughput 18 cubicles / shift, two-shift operation
  • PE-licensed engineers on shift 41 company-wide, Q4 2024 headcount

Holding both LV and MV under one QMS removes the integrator handoff that typically costs 6–10 weeks on a critical-power upgrade — and is one of the reasons 98.4% of 1,820+ delivered substations have been commissioned on or ahead of programme.

§ 03 / R&D AND PROPRIETARY IP

Fourteen active patents. One Ministry-accredited R&D Center. No white-label integration.

Er Teknik has been an accredited R&D Center under the Turkish Ministry of Industry and Technology since 2018 — meaning our power-conversion topologies are developed, simulated, prototype-built and tested in-house, not licensed from a third-party OEM.

A / ACCREDITATION

R&D Center · Ministry of Industry & Technology

Accreditation reference MoIT-RDC-2018-0417, renewed every two years under the Law no. 5746 framework. Eligibility unlocks Turkish R&D incentives and binds the Center to audited headcount, project-portfolio and IP-output thresholds.

Years accredited
06 (2018 → 2024)
R&D headcount
74 engineers
TOBB Top-100 Industrial R&D
4 years running (2020–2023)
Lab facilities
Power electronics · protection · EMC · thermal
B / IP PORTFOLIO

14 active patents in power-conversion topologies

Filed through the Turkish Patent and Trademark Office (TÜRKPATENT) and parallel-registered under the PCT route. Each patent maps to a topology or control method shipping in current Er Teknik product lines — not defensive paper.

  1. 01 Modular cascaded H-bridge for medium-voltage battery storage
  2. 02 Adaptive dead-time compensation in SiC-based PFC stages
  3. 03 Distributed DC bus architecture for PV-plus-BESS hybrids
  4. 04 Sub-cycle anti-islanding detection (IEC 62116 compliant)
  5. 05 Synchronous condenser emulation via grid-forming inverter
  6. 06 Selective harmonic-mitigation PWM for 36 kV MV drives
  7. 07 Solid-state transfer switch with sub-½-cycle break-before-make
  8. 08 Adaptive transformer-tap coordination under fault ride-through
  9. 09 Coordinated black-start sequencing for BESS-plus-DG islands
  10. 10 Dynamic line rating using PMU-stream convergence
  11. 11 Fault-tolerant modular multilevel converter bypass cell
  12. 12 Predictive thermal derating for outdoor MV cubicles
  13. 13 Edge-resident IEC 61850 GOOSE security gateway
  14. 14 Self-healing ring-main-unit protection scheme

Titles paraphrased for readability. Full patent numbers and abstracts available on request under NDA.

Independent sample testing across 1,820+ MV and LV substation deliveries (2007–2024) confirms an audited on-time commissioning rate of 98.4%, with the residual 1.6% consisting of client-driven scope changes rather than contractor delays. Documented in TÜV Rheinland Türkiye surveillance letter TR-TR-2024-A-1187.
TÜV Rheinland Türkiye Surveillance Letter TR-TR-2024-A-1187 · Issued October 2024 · On file
  • 98.4%on-time commissioning
  • 1,820+MV/LV substations sampled
  • 17years continuous operation
§ 05 / BANKABLE PERFORMANCE GUARANTEES

Performance bonds accepted by named ECAs — bid-ready on World Bank, EBRD and IsDB tenders.

A performance guarantee only counts if an export-credit agency will underwrite it. Er Teknik's performance bonds are bankable with the institutions below, on projects up to USD 42 million per single award.

Single-project bonded ceiling USD 42,000,000
Average contract size (FY 2023) USD 11.6M
Annual turnover (FY 2023, Deloitte-audited) USD 87.4M
Auditor Deloitte Türkiye

Submitting to a multilateral-financed tender? We can pre-issue the bond template within 5 business days.